GRIC - Redundant communications gateway for smart grid (Phase 1)
- Company / Centre:
- -
- Period:
- from 2014 to 2015
- Description:
-
In electrical substations there are electromagnetic disturbances that require using different interfaces to other facilities. This project aims to analyze and define the optimal interfaces between different elements to create a gateway for smart grids. Moreover, the various possible architectures for the module will be discussed, afterwards the most suitable will be selected and its main components defined.